Name of the Project:
Preparation of report on a physical condition of the national Highways stretch from on Toll operate transfer (TOT).
Description:
Topographical Survey of existing Road corridor using high resolution LiDAR technology
- 1. GCP creation every 250 m on the road and getting accurate level and traverse data using RTK or Auto level / Total Station to ensure than 10 cm accuracy + Points cloud + 360 degree images + Map 1:1000 with inventory + Cross section every 100 m + Topographic 3D + details + Contour map 30 cm.
- 2. Major Bridge cross sections for 300 m on either side and span arrangement
- 3. Minor Bridge cross sections for 100 m on either side and span arrangement
Falling Weight Deflectometer Testing:
Carrying out Falling Weight Deflectometer Test as per guide lines given in IRC 115:2015 including output of E modulus for each layer and life time
Videography by Drone:
Carry out the Aerial video by using Unmanned Aerial Vehicles.
The videography were conducted in the following highway stretches.
Location:
- Abu Road – Palanpur (NH 14) – 31 Km
- Chittorgarh – Kota & Chittorgarh Bypass (NH 27) – 160.500 Km
- Swaroopganj - Pindwar & Pindwar – Udaipur (NH 27) – 120 Km
- Palanpur/Khemana – Abu Road (NH 14) – 45 Km
- Jetpur - Somnath (NH 8D) 102.3 Km
- Chennai Bypaass (NH 4 & 45) 32.6 Km
- Kothakota Bypass – Kurnool (NH 7) 74.6 Km